barbara t

CLIENT: ENI E&P
LOCATION: OFF THE ADRIATIC COAST AREA OF ANCONA ON BOARD OF BARBARA T E BARBARA T2 PLATFORMS.

The target of the Revamping is to grant a flow rate up to 5000000stm3/day in front of lowering the suction pressure at the first compression stage. This will be achieved through a new configuration of the compression units installed on Barbara T / T2, which provides for the switching operation of the two Parallel to Series Operation, with the first compression stage installed on Barbara T (3-8 coffin), and second stage (pressure drop 8 – 44 bar) installed on T2.