skip to Main Content
Cern

CLIENT:: CERN
LOCATION: MAYREN – SWITZERLAND

Working as an EPC contractor 100 mt underground in the tunnel of the largest particle collider of the world :

EPC various AISI piping networks and refurbishing for LHC project By-pass 5.

Cryogenic Pipeline installation in LHC Tunnel – Basic and detail Engineering, procurement, installation, welding and tests for the realization of AISI pipelines for compressed air, demi-water, helium, chilled water for LHC project (about 220 Km).

EPC and refurbishing HAVC system for new CCC (CERN Control Centre)

Back To Top