skip to Main Content
tap

CLIENT: TAP ALBANIA
LOCATION: ACS03 Fier and ACS02 Bilisht – ALBANIA

EPC & Commissioning of a Gas Metering Station in Bilisht and of a Gas Compression Station in Fier, Albania.

The Gas Metering Station is designed to handle a maximum flow of 10 BCM per year.

The Gas compression station is designed for 3 compressors driven by gas turbine (3×14,7 MW).

The works includes 2 Compressor Buildings, an Electrical and Control Building, Utilities Building, Administration and workshop building and auxiliaries plants.

Back To Top