Gas compression for Snam Gas compression for Snam Gas compression for Snam

Gas compression for Snam

Italy
Projects
EPC Energy Division

The two Snam Rete Gas projects contracted to Renco by MAN Energy Solutions concern the adaptation of two gas compression stations in Malborghetto (Udine) and Messina, each with 12 MW nominal power.

Image
AdobeStock_350608835
2

gas compression stations

22

MM € contract value

60K

direct hours of work required

12

MW nominal power

Project type
Gas compression plants
Status
In progress
Client
Snam Rete Gas
Contractor
Consortium MAN Energy Solutions - Renco
Location
Malborghetto - Messina
Date of delivery
December 2025

key info

Image
I 7670 compression station Bordolano italia B
FOCUS
Adaptation of the gas compression stations

In detail

These are two distinct works for the adaptation of two gas compression stations with clearly defined aims. In Malborghetto: engineering, management, supply, transport and assembly of 2 electric compressors, including remote diagnostics, material storage, training courses, dismantling equipment, initial start-up and a 3-year warranty inclusive of routine and extraordinary maintenance. In the gas compression plant in Messina, the project concerns the replacement of a gas compression unit (TC-4) with two 12 MW electric compressors and the adaptation of part of the facility’s piping, plus the construction of new buildings. All the technical works listed for the Udine project will also be included here.

' The ability to succeed in highly competitive sectors, such as the gas compression sector, strengthens our relations with strategic partners such as Snam Rete Gas and MAN Energy Solutions '

Fabrizio FediCommercial Director
Image
20230113_134605

Focus on the details

CLOSE-UP ON THE PROJECT

Malborghetto will be the first “hybrid” plant to be built by Snam Rete Gas; in other words, it will also be powered with electricity, which will reduce emissions and, ultimately, contribute towards achieving carbon neutrality by 2050. Messina will be the second plant of this type to be built.

Image
AdobeStock_413551755
Image
danimarca 4

The partnership between Renco and Snam Rete Gas dates to 2003, when the first unit for the compression station in Terranuova Bracciolini (Arezzo) was installed by a temporary association of companies (Renco with Solar Turbines). This was followed by the supply and installation of turbo compressors for a further 4 compression stations. In total, Renco has collaborated with Snam / Stogit for 11 Solar turbo compressors. Further projects are being developed in relation to the Snam 2026 strategic plans.

Image
AdobeStock_529627341
Image
20230113_134620
Image
AdobeStock_52349979
Image
AdobeStock_529627341
Image
20230113_134620
Image
AdobeStock_52349979

Renco technicians at work in the gas compression stations in the Messina and Malborghetto plants

Teams of Renco operators working to adapt the gas-fired power stations for Snam

A sustainable choice

Image
AdobeStock_396761512_0-new.jpeg

THE HYBRID COMPRESSION STATIONS

In addition to compression units with methane-powered turbines, the plan is to install compression units driven by electric motors.

This will be done in stations for sustainable production processes, so as to eliminate gas emissions in the atmosphere.

Image
100162
Image
2015_7830 SNAM RETE GAS SERGNANO ITALIA
Image
gas-compression-station-Bracciolini